Temporary Diversion of Covered Walkway (Yuet Wah Street to MTR Kwun Tong Station Exit D) and Temporary Closure of Staircase (Yuet Wah Street to Kwun Tong Road).
To facilitate the construction of proposed pedestrian deck, two temporary pedestrian traffic arrangement will be implemented shortly.
1. About 30m long existing covered walkway near Kwun Tong Road / Hip Wo Street Rest Garden which connecting Yuet Wah Street and MTR Kwun Tong Station Exit D will be temporary diverted. A temporary walkway will be provided during the arrangement.
2. The lower flights of staircase connecting Yuet Wah Street and Kwun Tong Road will be temporarily closed. During this period, pedestrian can use the staircase at MTR Kwun Tong Station Exit C for access to Kwun Tong Road.
Appropriate directional signs will be provided on site to guide pedestrian.